1/54
Category
1 Waste-to-Energy 2 MBT plants 3 Sorting Plants 3.1 Dry Recyclables 3.2 Packaging 3.3 Plastics 3.4 Metal 3.5 Paper 3.6 Glass 3.7 Bulky Waste 3.8 Batteries 3.9 E-Scrap 3.10 Construction & Demolition 3.11 Other Sorting Plants 4 Recycling plants 4.1 Plastics, material 4.2 Plastics, chemical 4.3 Paper 4.4 Other Recycling Plants 5 Biomass-to-Power 6 Anaerobic digestion 7 Hazardous waste

Plant

Name
Bibra Lake
Country
Australia
Type
Batteries
Province/Region
Western Australia
Status
active
Capacity
43.000
Planned extension (t/a)
n/a
Input
lead-acid batteries
Investment sum
n/a
Throughput
n/a
Start of operation
2021
Output
n/a
Involved car OEM
n/a
General contractor
n/a
Throughput (t/a)
n/a
Size category
unknown

 

Operator

Pure Environmental Pty Ltd
8-10 Winchester Rd
6163
1300 652 774
info@purenv.au
Search
Country


Downloads

BAT Project Tracker

BAT, List Of Active Plants

What you see is a trial version of ecoprog's waste & bio data.

Data sets in this section
in trial version: 54
in full version: 323