19/30
Category
1 Waste-to-Energy 2 MBT plants 3 Sorting Plants 3.1 Dry Recyclables 3.2 Packaging 3.3 Plastics 3.4 Metal 3.5 Paper 3.6 Glass 3.7 Bulky Waste 3.8 Batteries 3.9 E-Scrap 3.10 Construction & Demolition 3.11 Other Sorting Plants 4 Recycling plants 4.1 Plastics, material 4.2 Plastics, chemical 4.3 Paper 4.4 Other Recycling Plants 5 Biomass-to-Power 6 Anaerobic digestion 7 Hazardous waste
1 Waste-to-Energy 2 MBT plants 3 Sorting Plants 3.1 Dry Recyclables 3.2 Packaging 3.3 Plastics 3.4 Metal 3.5 Paper 3.6 Glass 3.7 Bulky Waste 3.8 Batteries 3.9 E-Scrap 3.10 Construction & Demolition 3.11 Other Sorting Plants 4 Recycling plants 4.1 Plastics, material 4.2 Plastics, chemical 4.3 Paper 4.4 Other Recycling Plants 5 Biomass-to-Power 6 Anaerobic digestion 7 Hazardous waste
Plant
Name
Singapore Integrated Waste Management Phase I
Country
Singapore
Type
Waste to Energy
Province/Region
n/a
Status
under construction
Investments
n/a
Start of operation
n/a
Heat use category
unknown
Input, capacity [t/a]
1,058,500
Input real
n/a
Input real (year of data)
n/a
Power generation capacity [MW]
146.0
Heat production capacity [MW]
n/a
Gross heat production [MW]
416.0
Average heating value [kJ/kg]
10,000
Fuel
MSW
Size category
>20
Fuel
MSW
Remarks: 05/24: Delayed and is now not expected to be completed progressively from 2026 onwards. In 2021, Keppel Seghers appointed Swiss-based AIK Technik AG to deliver an Acid Fly Ash Washing (FAW) system. 12/21: Konecranes will deliver 6 WtE cranes in 2023. 04/2020, the National Environment Agency (NEA) has awarded the EPC contract to a consortium led by Keppel Seghers Engineering. The contract has a value of SGD 1.5 billion (EUR 938 million). The consortium is a combination of Keppel Seghers Engineering, China Harbour Engineering Company and ST Engineering Marine. Includes a 250 tpd MRF.
Unit 1
Status
under construction
Start of operation
n/a
End of operation
n/a
Year of awarding
n/a
Input tons per hour
37.5
Unit fuel
MSW
Combustion Technology
air cooled grate
Main steam production at t/h at bar/°C
n/a
Technology provider
Keppel Seghers
Flue gas cleaning technology (FGCT)
Fabric filters + SNCR + AC+ Wet Scrubbers
FGCT provider
Andritz
plant.label.unit.seperator_1
n/a
Gross heat production [MW]
104.0
Heat production capacity [MW]
n/a
Power generation capacity [MW]
36.5
Power generation technology (PGT)
n/a
PGT provider
n/a
Remarks: 01/26: Originally, start of operation of the unit was planned for 2025. However, as of early 2026 we have no information about the current status of the project.
Unit 2
Status
under construction
Start of operation
n/a
End of operation
n/a
Year of awarding
n/a
Input tons per hour
37.5
Unit fuel
MSW
Combustion Technology
air cooled grate
Main steam production at t/h at bar/°C
n/a
Technology provider
Keppel Seghers
Flue gas cleaning technology (FGCT)
Fabric filters + SNCR + AC+ Wet Scrubbers
FGCT provider
Andritz
plant.label.unit.seperator_1
n/a
Gross heat production [MW]
104.0
Heat production capacity [MW]
n/a
Power generation capacity [MW]
36.5
Power generation technology (PGT)
n/a
PGT provider
n/a
Remarks: 01/26: Originally, start of operation of the unit was planned for 2025. However, as of early 2026 we have no information about the current status of the project.
Unit 3
Status
under construction
Start of operation
n/a
End of operation
n/a
Year of awarding
n/a
Input tons per hour
37.5
Unit fuel
MSW
Combustion Technology
air cooled grate
Main steam production at t/h at bar/°C
n/a
Technology provider
Keppel Seghers
Flue gas cleaning technology (FGCT)
Farbric filters + SNCR + AC+ Wet Scrubbers
FGCT provider
Andritz
plant.label.unit.seperator_1
n/a
Gross heat production [MW]
104.0
Heat production capacity [MW]
n/a
Power generation capacity [MW]
36.5
Power generation technology (PGT)
n/a
PGT provider
n/a
Remarks: 01/26: Originally, start of operation of the unit was planned for 2025. However, as of early 2026 we have no information about the current status of the project.
Unit 4
Status
under construction
Start of operation
n/a
End of operation
n/a
Year of awarding
n/a
Input tons per hour
37.5
Unit fuel
MSW
Combustion Technology
air cooled grate
Main steam production at t/h at bar/°C
n/a
Technology provider
Keppel Seghers
Flue gas cleaning technology (FGCT)
Fabric filters + SNCR + AC+ Wet Scrubbers
FGCT provider
Andritz
plant.label.unit.seperator_1
n/a
Gross heat production [MW]
104.0
Heat production capacity [MW]
n/a
Power generation capacity [MW]
36.5
Power generation technology (PGT)
n/a
PGT provider
n/a
Remarks: 01/26: Originally, start of operation of the unit was planned for 2025. However, as of early 2026 we have no information about the current status of the project.
Downloads
What you see is a trial version of ecoprog's waste & bio data.
Data sets in this section
in trial version: 30
in full version: 4208
Data sets in this section
in trial version: 30
in full version: 4208