1 Waste-to-Energy 2 MBT plants 3 Sorting Plants 3.1 Dry Recyclables 3.2 Packaging 3.3 Plastics 3.4 Metal 3.5 Paper 3.6 Glass 3.7 Bulky Waste 3.8 Batteries 3.9 E-Scrap 3.10 Construction & Demolition 3.11 Other Sorting Plants 4 Recycling plants 4.1 Plastics, material 4.2 Plastics, chemical 4.3 Paper 4.4 Other Recycling Plants 5 Biomass-to-Power 6 Anaerobic digestion 7 Hazardous waste

Plant

Name
La Galera
Country
Spain
Type
Biogas
Province/Region
Catalonia
Status
active
Investments
6.00
Start of operation
2020
Input, capacity [t/a]
50,000
Power generation capacity [kW]
2,200
Heat production capacity [kW]
n/a
Use of biogas
biomethane (fuel)
Biogas production per year [Nm3/a]
n/a
Biomethane production per hour [Nm3/h]
500
Electricity output per year [kWhel]
n/a
Number of chps
n/a
Digester volume [m3]
n/a
Post fermenter [m3]
n/a
Depot [m3]
n/a
Expansion date
n/a
Expansion capacity [kWel]
n/a
Fermentation technology
n/a
upgrading technology
n/a
Process temperature
n/a
Fuel
olive waste, food industry waste, slurry,
manufacturer upgrading technology
n/a
Plant manufacturer
n/a
Remarks: 02/25: Ence has secured project financing from Spanish banking group BBVA for its biomethane plant in La Galera. With this investment, ENCE plans to modify the plant’s production process.
12/24: Ence Biogás, subsidiary of Ence Group, has acquired the biomethane plant in La Galera. The company plans to upgrade the plant to meet its environmental standards.
In 08/2022, works are underway to connect the biomethane plant by Biometagás to the Enagás grid as an injection permit has now been secured. The plant has a capacity of 4 million nm³ of biomethane annually.
As of 07/2021, AGF Ingeniería de Procesos is currently delivering the biomethane equipment for the conversion. The plant should start operations in August and become fully operational by September.
In 03/2021, gas grid operator Enagás has signed an agreement with the companies Infraestructura Biometagás and Biometagás La Galera to connect the plant to the national grid. Infraestructura Biometagás will own the pipeline that connects the plant to the Enagás network. The plant will be upgraded to produce 50 GWh of biomethane annually by treating 150 tpd. Biogas engineering company AGF Ingeniería de Procesos will provide the upgrading technology. The connection should be completed in 2021.
Reported active in September 2020. Production at the plant will increase gradually until full production capacity is reached by the first half of 2021

 

Operator

Ence Biogas
Search
Country


Downloads

Biogas Project Tracker

Biogas, List Of Active Plants

What you see is a trial version of ecoprog's waste & bio data.

Data sets in this section
in trial version: 60
in full version: 11860