1 Waste-to-Energy 2 MBT plants 3 Sorting Plants 3.1 Dry Recyclables 3.2 Packaging 3.3 Plastics 3.4 Metal 3.5 Paper 3.6 Glass 3.7 Bulky Waste 3.8 Batteries 3.9 E-Scrap 3.10 Construction & Demolition 3.11 Other Sorting Plants 4 Recycling plants 4.1 Plastics, material 4.2 Plastics, chemical 4.3 Paper 4.4 Other Recycling Plants 5 Biomass-to-Power 6 Anaerobic digestion 7 Hazardous waste
1 Waste-to-Energy 2 MBT plants 3 Sorting Plants 3.1 Dry Recyclables 3.2 Packaging 3.3 Plastics 3.4 Metal 3.5 Paper 3.6 Glass 3.7 Bulky Waste 3.8 Batteries 3.9 E-Scrap 3.10 Construction & Demolition 3.11 Other Sorting Plants 4 Recycling plants 4.1 Plastics, material 4.2 Plastics, chemical 4.3 Paper 4.4 Other Recycling Plants 5 Biomass-to-Power 6 Anaerobic digestion 7 Hazardous waste
Plant
Name
Vendeuvre I
Country
France
Type
Biogas
Province/Region
Normandy
Status
approved
Investments
n/a
Start of operation
n/a
Input, capacity [t/a]
40,000
Power generation capacity [kW]
n/a
Heat production capacity [kW]
n/a
Use of biogas
biomethane (grid)
Biogas production per year [Nm3/a]
n/a
Biomethane production per hour [Nm3/h]
350
Electricity output per year [kWhel]
n/a
Number of chps
n/a
Digester volume [m3]
n/a
Post fermenter [m3]
n/a
Depot [m3]
n/a
Expansion date
n/a
Expansion capacity [kWel]
n/a
Fermentation technology
n/a
upgrading technology
n/a
Process temperature
n/a
Fuel
agricultural waste, mostly crop products, beet pulp and manure
manufacturer upgrading technology
n/a
Remarks: As of February 2022, the project is facing delays. Commissioning of the plant was originally scheduled for early 2021, but in early 2022, construction has not yet started and the project is still awaiting a court decision, which should be made this year. The project is contested by a regional environmental group and a collective. In 01/2020, a public meeting was held on the project. In 06/2019, the municipal council of Saint-Pierre-en-Auge has approved plans for a biogas project by SAS Les Groseillers and cereal trader Lepicard in Vendeuvre. Public consultation period lasted until 5 June, 2019. Feedstock is supplied by nearby farms. Biomethane will be injected into the GRTgaz grid.
Operator
SAS Les GroseillersDownloads
What you see is a trial version of ecoprog's waste & bio data.
Data sets in this section
in trial version: 60
in full version: 11859
Data sets in this section
in trial version: 60
in full version: 11859